Friday Jul 20, 2018

The Dedicated Terminals

BIK Port

 

       A-THE CONTAINER TERMINAL

The container terminal was established in 1976 , and is considered to be one of the most important terminals at BIK Port .The container terminal of  BIK has 5 berths with the total length of 1050 meters and an average draft of 11 - 12.5 meters.

Design : The terminal has 5 berths with the total length of 1050 meters and are equipped by 4 gantry cranes.

Container Yard (CY) : The container yard area are equipped by transtainer capable of an arrangement of 6 containers in width and 4 in height with a designated  access way for load and discharge .

Installations   : The main office , customer affairs, operation facility, coastal equipment workshop .

Railway : The CY & CFS warehouses have full access to two railway tracks for the load and discharge of wagons.

The lateral facilities: The depot yards for refrigerated and empty containers, stuffing and stripping of containers , and also  the workshop

 

 

         NAME                     AREA             CAPACITY                           PURPOSE

container yard           156,782 sqm  20,644(4+1)TEU   export, import, transit, transship

empty container area  60,000 sqm    4,400(3+1)TEU     storage of empty containers

cfs warehouse           19,920 sqm              -                    temporary storage

wharf area                   30,000 sqm             -                         stuff & strip

workshop                     5,040 sqm               -                   equipment maintenance  

coastal workshop         300 sqm                  -                  coastal equipment workshop

main office                     350 sqm                  -                  administration

 

The Facilities :

 

      Iran

       Type of Work : load & discharge of Containers

       Capacity : 700,000 TEU

       Warehouse : CFS Warehouse

       Warehouse area : 92,019 sqm

        Open yard area: 296,782 sqm

       Total  Berths : 5 posts

         Manpower : 650 personnel

 

       

 

        Gantry Cranes            4                   40 tons

        Yard Cranes               3                    140 tons

         

         Lift trucks                   2                    5-15 tons

         Lift trucks                   2                  over 15 tons

         Reach stacker          5                     40 tons

         RTG                          5                     40 tons

         Mini loaders              3                 over 90 tons

         Pullers                      64                    30 tons

 

 

 

 General

Co.

Type of Work : Grain load & discharge Operation

Operation Capacity : 8 Million Tons

Warehouse : 3 warehouses

Total Warehouse area : 27,000 sqm

Total yard area : 200,000 sqm

Total berths : 7 posts

Manpower : 360 personnel

 

   

 

 

     NAME                     TOTAL         CAPACITY

Grain Suction                 7                  220 tons/hour

Grain Suction                 2                  400 tons/hour

Coastal Crane                3                  85-100 tons/hour

Coastal Crane                4                  25 tons/hour

       Buggy                      2                      90 tons

 

 

 

Terminal Operator : Gulf Agency Co.

Tehran , Mirdamad Blvd. #251 , www.gacworld.com

Type of Work : storekeeping, tally, stevedoring

Operation Capacity : 650,000 Tons

Warehouse : 2 warehouses

Warehouse area : 18,000 sqm

Total terminal area : 116,141 sqm

Total berths : 3 posts

Manpower : 430 personnel

 

The Equipments :

 

 

     NAME                     TOTAL             CAPACITY

     Crane                          2                  up to 25 tons

     Crane                          2                    25-40 tons

     Crane                          7                   over 40 tons

  

   Lift trucks                      30                   5-15 tons

   Lift trucks                      6                    over 15 tons

    Top Lift                         2                   over 40 tons

     Puller                          14                  ---------------

 

 

 

General

Co.

Tehran , Mirdamad Blvd. #165 , www.kaveh-it.com

The major part of the terminal operator’s activity are attracted by the marketing department .

Type of Work : transit, cabotage, transship, imports,

Operation Capacity : 1,100,000 Tons

Warehouse : 20 warehouses

Total Warehouse area : 318,000 sqm

: 78,500 sqm

Total berths : 7 posts

Manpower : 400 personnel

 

The Equipments :

 

 

     NAME                     TOTAL             CAPACITY

   Yard Crane                  5                  up to 25 tons

   Yard Crane                  3                    25-40 tons

   Yard Crane                  9                   over 40 tons

    Top lift                         3                   over 40 tons

   Lift trucks                     18                less than 5 tons

   Lift trucks                     18                   5-15 tons

   Lift trucks                     11                  over 15 tons

    Puller                          23                        ---------

 

 

 

General

 

 

Terminal Operator : Bonyad Barandaz Co.

Tehran , Gandy Ave. #24 , www.bobacoir.com

Type of Work : load & discharge operation

Operation Capacity : 850,000 Tons

Warehouse : 2 warehouses

Total Warehouse area : 18,000 sqm

Total open yard area: 124,111 sqm

Total berths : 3 posts

Manpower : 500 personnel

 

The Equipments :

 

 

     NAME                     TOTAL             CAPACITY

     Crane                          2                  up to 25 tons

     Crane                          3                    25-40 tons

     Crane                          7                   over 40 tons

   Lift trucks                      1                 less than 5 tons

   Lift trucks                      17                   5-15 tons

   Lift trucks                      10                    over 15 tons

     Puller                           22                  ---------------

 

The Export terminal   :

 

 

General

 

 

Co.

Tehran , Mirdamad Blvd. #165 , www.kaveh-it.com

The major part of the terminal  activity are attracted by the marketing department of the operator .

Terminal Operator : Kaveh Maritime Co.

Warehouse : 3 warehouses

Total Warehouse area : 13,500 sqm

Open yard area : 78,500 sqm

 

The Equipments :

 

 

     NAME                     TOTAL            

     Lift truck                      12                

     Top lift                         2                

      puller                         14                  

     crane                           2                

  

The export terminal , has the responsibility of supervision over the operations such as load & discharge of the bulk cargos and direct transport , direct transport of the export / transit / cabotage  and transshipment cargos  

The operations of the following exclusive sites are under the supervision of the export terminal :

-          The Iran Marine Services

-          The Mehvar Talaie

-          The Behran Oil Co.

-          The Fars Cement and construction  materials

 

Iran Marine Services :

Berth #34 , length of 182.5 meters

The application : load/discharge of oil derivatives

Average operation rate(to/from vessel ) : 2000 to 3000 tons/hour

The loading rate : the loading capacity rate of the pumps are 1000 tons/shift

The loading facility from berths : 2 connection lines to berth #34

 

- The Mehvar Talaie Storage Terminal :

  

  Storage tanks : 12 tanks

   Capacity : 13,000 tons

   The average operation rate (to/from vessel ) : 2000-3000 tons/hour

   The application : load , discharge , storage of oil derivatives

  

   The loading facility form berths : under construction

 

-          The Behran Oil Terminal :

   Berth #34 , length of 182.5 meters

   Storage tanks : 12 tanks

   Capacity : 13,000 tons

   The average operation rate (to/from vessel ) : 2000-3000 tons/hour

   The application : load , discharge , storage of oil derivatives

   The loading rate : the loading capacity rate of the pumps are 1000 tons/shift 

        The loading facility from berths : 2 connection lines to berths# 33,34

 

The construction material terminal :

Berth : 2 posts , Posts #31,34 with the total length of 365 meters and capable of load & discharge of mineral materials .  

Warehouse : #T31

Open yard : A31

 

The transit silos terminal :

The transit silos terminal was constructed for the rapid speed in grain operation with the 75,000 ton capacity and special advantages. The silos, include the open yard storage area with the capacity of 170,000 tons . The silos are in  conjunction of the marine and road transportation and just like the other berths and wharves of the BIK Port is connected to the railway tracks. The terminal includes 30 silos with a total capacity of 30,000 tons, 5 single silos with a total capacity of 37,500 tons and an open yard storage area with the capacity of 7,500 tons . the silos are equipped with 2 powerful on-loaders, 2 suction system for the silo’s surface vacuum, vertical & horizontal belt conveyor systems to transport 3000 tons/hour grain . The facility is capable of an annual transport of (load & discharge) 4-6 million tons of grain. The silos also include 2 wagon scale system and 3 (six hundred tons ) truck scale system.

 

The bulk & direct transport terminal :

The terminal has the responsibility to supervise the  discharge of bulk cargos and the direct transport operation. The following sites are under the supervision of the bulk & direct transport terminal :

-          the Aluminum of Iran Co.: Aluminum Site

-          the Behshahr Oil Co . : Oil storage tanks

-          the Mahidasht of Kermanshah Industrial Co. :

-          the Shomal Industrial Co. : vegetable oil tanks

 

. :

Berth : berth # 6 , with the length of 175 meters and capable of discharging of aluminum powder , the average rate of operation of this system is 1,200tons/hour.

 

The Behshahr oil co., Mahidasht of Kermanshah ind.co., Shomal ind.co.:

Berth : berth posts #21,22 and the availability of 2 connection lines to the berths

Storage tanks : 61 storage tanks

Capacity : 202,500 Tons

The average operation rate (discharge) : 3000 tons/daily

The operation : the storage of vegetable oil and the transfer of the  raw material from vessel to storage tanks and the delivery to oil refinery plants by trucks. The operation will simplify the discharge operation and also reduce any  vessel demurrage . The two lines connected to the berths makes it possible to directly transfer the cargo from berth to the storage tanks .  

 

The total oil storage tanks at port’s hinterland

Co. name                              tanks             capacity (tons)

Kesht va Saneat shomal        19                    66,500

Sorben of shomal industries     6                    21,000

      Mahidasht of Kermanshah       6                    10,000

   Total                    61 tanks           202,500 tons