یکشنبه ۳ بهمن ۱۳۹۵

1          INADEQUACY OF FACILITIES 

 

به روز رسانی :  1395/10/10    یوسف مرادپور

1.1       Type and amount of waste for which the port reception facility was inadequate and nature of problems encountered                

 

Type of waste

 

Amount for discharge (m3)

 

Amount not

accepted (m3)

Problems encountered

Indicate the problems encountered by using one or more of the following code letters, as appropriate.

A   No facility available

B   Undue delay

C   Use of facility technically not possible

D   Inconvenient location

E    Vessel had to shift berth involving delay/cost

F    Unreasonable charges for use of facilities

G   Other (please specify in paragraph 3.2)

MARPOL Annex I-related

Type of oily waste:

 

 

 

Oily bilge water

 

 

 

Oily residues (sludge)

 

 

 

Oily tank washings (slops)

 

 

 

Dirty ballast water

 

 

 

Scale and sludge from tank cleaning

 

 

 

Other (please specify ……………….)

 

 

 

MARPOL Annex II-related

Category of NLS[1] residue/water mixture for discharge to facility from tank washings:

 

 

 

Category X substance

 

 

 

Category  Y substance

 

 

 

Category Z substance

 

 

 

MARPOL Annex IV-related

 

 

 

Sewage

 

 

 

MARPOL Annex V-related

Type of garbage:

 

 

 

Plastic

 

 

 

Floating dunnage, lining, or packing materials

 

 

 

Ground paper products, rags, glass, metal, bottles, crockery, etc.

 

 

 

Cargo residues, paper products, rags, glass, metal, bottles, crockery, etc.

 

 

 

Food waste

 

 

 

Incinerator, ash

 

 

 

Other (please specify ……………….)

 

 

 

MARPOL Annex VI-related

 

 

 

Ozone-depleting substances and equipment containing such substances

 

 

 

Exhaust gas-cleaning residues

 

 

 

 

1.2       Additional information with regard to the problems identified in the above table.

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

 

1.3       Did you discuss these problems or report them to the port reception facility?

            ¨ Yes              ¨ No

           

            If Yes , with whom (please specify)

________________________________________________________________________

           

            If Yes, what was the response of the port reception facility to your concerns?

________________________________________________________________________

           

 

1.4       Did you give prior notification (in accordance with relevant port requirements) about the vessel’s requirements for reception facilities?

            ¨ Yes              ¨ No           ¨ Not applicable

 

            If Yes, did you receive confirmation on the availability of reception facilities on arrival?  

            ¨ Yes              ¨ No           

 

2          ADDITIONAL REMARKS/COMMENTS

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

 

 

           

 Master’s signature                  Date: __/__/____ (dd/mm/yyyy)



[1]       Indicate, in paragraph 3.2, the proper shipping name of the NLS involved and whether the substance is designated as ‘solidifying’ or ‘high viscosity’ as per MARPOL Annex II, regulation 1, paragraphs 15.1 and 17.1 respectively.